M5 acceptance: two devices, messages both ways #38

Open
opened 2026-10-05 20:07:23 +00:00 by twisla · 0 comments
Owner

What

The test that closes M5, with the reference node (#22) running stock Meshtastic: this firmware and stock firmware talk to each other, both ways, and the result is written into docs/milestones/M5.md.

To do

  1. A text on the default Channel from the Cardputer shows in the Meshtastic phone app, and the other way round.
  2. A Direct Message each way, acknowledged.
  3. Our node info, names and position (when shared) show correctly on the reference node.
  4. A second Channel with a private key: the same, and nothing readable on the default one.
  5. With a third Node if there is one: a message relayed by the Cardputer, and one relayed for it.
  6. The Duty Cycle Budget holds under a burst of messages.
  7. A range walk: how far the two still talk, each way. A figure for #20.
  8. A Capture of all of it, kept as fixtures.

Related

#22, #34, #35, #36, #33, #37, #32, #20.

## What The test that closes M5, with the reference node (#22) running stock Meshtastic: this firmware and stock firmware talk to each other, both ways, and the result is written into `docs/milestones/M5.md`. ## To do 1. A text on the default Channel from the Cardputer shows in the Meshtastic phone app, and the other way round. 2. A Direct Message each way, acknowledged. 3. Our node info, names and position (when shared) show correctly on the reference node. 4. A second Channel with a private key: the same, and nothing readable on the default one. 5. With a third Node if there is one: a message relayed by the Cardputer, and one relayed for it. 6. The Duty Cycle Budget holds under a burst of messages. 7. A range walk: how far the two still talk, each way. A figure for #20. 8. A Capture of all of it, kept as fixtures. ## Related #22, #34, #35, #36, #33, #37, #32, #20.
twisla added this to the M5 Mesh transmit milestone 2026-10-05 20:07:23 +00:00
twisla added the
kind
chore
area/lora
status
blocked
priority
medium
labels 2026-10-05 20:07:23 +00:00
twisla added a new dependency 2026-10-05 20:07:24 +00:00
twisla added a new dependency 2026-10-05 20:07:24 +00:00
twisla added a new dependency 2026-10-05 20:07:24 +00:00
twisla added a new dependency 2026-10-05 20:07:24 +00:00
twisla added a new dependency 2026-10-05 20:07:24 +00:00
twisla added a new dependency 2026-10-05 20:07:25 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Reference: twisla/roro9stack#38